J/111 Project Update
The hull plug is rapidly taking shape at CCF in Bristol. This week the strongback was constructed and leveled and then section frames and centerline longitudinal erected. The transom is…
The hull plug is rapidly taking shape at CCF in Bristol. This week the strongback was constructed and leveled and then section frames and centerline longitudinal erected. The transom is…